4D BIM for Construction

Where does CPM and 2D fit in the Digital Construction Age?

Posted by Tom Dengenis on Feb 17, 2017 10:03:29 PM

Within a few years of its’ introduction, Critical Path Method (CPM)- a project modelling technique developed in the late 1950s- succeeded in making positive performance impacts in both manufacturing and the defence industries.  “The critical path method was developed at the DuPont Company in 1957 by a pair of mathematicians who were looking at ways to avoid the costs of plant shutdowns and restarts caused by inefficient scheduling. Their research showed that money could be saved by focusing efforts on performing the right tasks at the right times, rather than flooding the problem with labor to stay on schedule. This saved DuPont 25 percent on shutdowns...” (http://yourbusiness.azcentral.com/history-critical-path-method-24351.html) This created big hopes and excitement for CPM to also improve construction project delivery performance.  Construction companies began adopting CPM in the late 1950s and early 1960s. By the late 1970’s and early 1980’s, the personal computer made CPM affordable and accessible to the masses; so how has construction performance fared since  CPM became the standard for construction planning and scheduling?

Read More

Synchro Platform 2016.2 Release

Posted by Tom Dengenis on Sep 30, 2016 5:53:24 PM

RELEASE NOTES 

Version 5.3.2   30 September 2016

Read More

Week 5 - Synchro PRO and Contract Management

Posted by Pawel Krecz on Sep 8, 2016 6:14:25 AM

The medium is the message.

Read More

WEEK 4 – SYNCHRO PRO AND PROJECT MANAGEMENT

Posted by Pawel Krecz on Aug 29, 2016 7:35:05 PM

To improve is to change; to be perfect is to change often.

Read More

The Concept of VDC Stages

Posted by Tom Dengenis on May 31, 2016 4:00:00 AM

The concept of Virtual Design and Construction (VDC) Stages is an important tool when gauging progress towards claiming a company or project to be deemed a modern, 21st century digital construction operation.  Viewing the maturity process as stages in a journey, will help the industry move from  the 2D CAD files, plan racks, and Gantt chart’s that clutter and wallpaper jobsite offices, to computer graphics, structured project data, information transparency and, ultimately, into the integrated systems of the digital age that is driving enormous production gains in industries that construction serves every day.

Read More

Construction Project Owners- Are You Leading High Performance Construction?

Posted by Sue Dengenis on Feb 9, 2016 6:39:46 PM

Owners- you have the power to improve your construction project performance and to support your contractors’ success by requiring new performance standards.   Improvement and innovation is win- win.  Yes, projects are increasingly complex; yes, supply chains are global; yes, the design world has advanced technologically. This is reality; the only certainty is that change will continue and the pace will increase.    Recognize that owners’ specifications drive innovation and progress.   Technology for design has improved significantly, primarily due to Owner’s specifying new BIM standards of practice from their design teams.  It is time to expect contractors’ project management tools to also significantly improve in order to keep pace with industry needs. Construction teams need tools that provide insight and digital integration from design through construction and into facility operations.

Read More

Improving Construction The Synchro Way: Real Results

Posted by Sue Dengenis on Jan 13, 2016 12:03:40 PM

It's January, kick off the year with a commitment to continuous and measurable improvement!

In 2015 the use of 4D planning and scheduling increased significantly- numerous presentations were made at conferences demonstrating the implementation workflows and the powerful results: improved safety, increased productivity, lower cost and greater reliability.  The results come from the transparency and cooperation that true 4D visual scheduling enables. 

 Why the big interest in 4D BIM for construction?  The industry is at a point were complexity continues to grow and profit margins are slim- something has to change or the risks inherent in construction will outweigh the benefit.  Traditional CPM and Gantt charts tools have been the standard for decades but the results have left the industry in a place where on-budget and on-time are not the norm and only sometimes achieved-last year in the UK only 40% of projects were delivered on time.   Thankfully, however, the future is bright. Industry leaders who have chosen to challenge the status quo are reaping the rewards from purpose built 21st century digital technology.  Synchro PRO is leading Improvement, Innovation and Cooperation- the results are significant.

Read More

MAXIMIZE THE VALUE OF 3D DATA THROUGH 4D PLANNING

Posted by Jacqueline Chen on Oct 29, 2015 11:00:00 AM

Several months ago, I was involved in a complicated heavy highway project which included the reconstruction of multiple State roads, the preservation of several bridges, the replacement of partial MSE retaining walls underneath ramps, the replacement of two sign structures and upgrades to existing traffic signal systems, not to mention traffic switches, closures and detours of ramps, intersections, overpasses and pedestrian walkways. I recalled that my morning started with a review of drawings (296 pages, half-size) with a construction manager who had over 25 years of experience. We were requested to provide a draft of the design schedule along with a PS&E submission by end of the following week. Seven revisions were done after, and a “what if” analysis was performed to estimate open to traffic time of one major ramp and predict project finish dates with different notice-to-proceed dates.

Read More

10 Point Checklist: Is 4D Construction Software Right For You?

Posted by Sue Dengenis on Oct 1, 2015 3:53:48 PM

Wake Up and Smell the Sawdust!!

According to the CIOB (Chartered Institute of Building), the construction industry’s ability to deliver projects on time fell from 45% in 2014 to 40% this year. That’s dismal.  We hear these disappointing stats regularly and yet little seems to change, year after year.  Is the problem a lack of leadership, poor technology or a faulty process?  My opinion, some of all of these, but I will save that discussion for another time.  I am more interested in how to create change.   How do we move the industry to a position of leadership in both innovation and performance?  The good news is, the change has already begun- if you haven’t noticed you need to wake up and seize the opportunity- the future is bright and truly exciting!     

Read More

Build NY Live: Connecting the Community with BIM

Posted by Jessica Makrinos on Sep 30, 2015 10:01:45 AM


Starting mid-day on September 21, team BIM Unlimited gathered around 2D plans of Hudson Yards and brainstormed ideas for the Western side of Western Yards. Western Yards is the western side of Hudson Yards, a 17 million square foot piece of property that combines both commercial and residential space.  

48 hours later, BIM Unlimited presented a Synchro PRO 4D model and won the Sustainability and Constructability Award. 

Read More