4D BIM for Construction

Visual Storytelling

Posted by Tom Dengenis on Mar 6, 2017 5:01:22 PM

This past week as we are preparing for the next Synchro Software User’s Conference it has been very hard to avoid the news and broadcast interviews about the Oscars award ceremony and the event played out for the Best Picture winner Moonlight.  Among the chatter I heard an interview that described the power of storytelling and it caught my attention.  In the conversation Cheo Hodari Coker said among many things that:

Read More

Where does CPM and 2D fit in the Digital Construction Age?

Posted by Tom Dengenis on Feb 17, 2017 10:03:29 PM

Within a few years of its’ introduction, Critical Path Method (CPM)- a project modelling technique developed in the late 1950s- succeeded in making positive performance impacts in both manufacturing and the defence industries.  “The critical path method was developed at the DuPont Company in 1957 by a pair of mathematicians who were looking at ways to avoid the costs of plant shutdowns and restarts caused by inefficient scheduling. Their research showed that money could be saved by focusing efforts on performing the right tasks at the right times, rather than flooding the problem with labor to stay on schedule. This saved DuPont 25 percent on shutdowns...” (http://yourbusiness.azcentral.com/history-critical-path-method-24351.html) This created big hopes and excitement for CPM to also improve construction project delivery performance.  Construction companies began adopting CPM in the late 1950s and early 1960s. By the late 1970’s and early 1980’s, the personal computer made CPM affordable and accessible to the masses; so how has construction performance fared since  CPM became the standard for construction planning and scheduling?

Read More

Synchro Platform 2016.2 Release

Posted by Tom Dengenis on Sep 30, 2016 4:53:24 PM

RELEASE NOTES 

Version 5.3.2   30 September 2016

Read More

WEEK 4 – SYNCHRO PRO AND PROJECT MANAGEMENT

Posted by Pawel Krecz on Aug 29, 2016 6:35:05 PM

To improve is to change; to be perfect is to change often.

Read More

WEEK 3: SYNCHRO SOFTWARE AS A 4D PLANNING SOLUTION

Posted by Pawel Krecz on Aug 22, 2016 5:42:48 PM

“The most exciting time is when I think of an idea and how I imagine I can make it. It would be wonderful if there was a projector inside my eye that and it could just put the idea on the screen for people to see.”

Read More

The Concept of VDC Stages

Posted by Tom Dengenis on May 31, 2016 3:00:00 AM

The concept of Virtual Design and Construction (VDC) Stages is an important tool when gauging progress towards claiming a company or project to be deemed a modern, 21st century digital construction operation.  Viewing the maturity process as stages in a journey, will help the industry move from  the 2D CAD files, plan racks, and Gantt chart’s that clutter and wallpaper jobsite offices, to computer graphics, structured project data, information transparency and, ultimately, into the integrated systems of the digital age that is driving enormous production gains in industries that construction serves every day.

Read More

Use of 4D Modeling in Simulating Plant Construction Operations

Posted by Jon Berkoe on Mar 11, 2016 5:04:53 PM

Achieving a breakthrough in construction planning-improving safety and efficiency?

Every construction project is different and the current planning methods result in many operational challenges not being discovered until the last few days before the relevant work has to be done. The desired breakthrough can only be achieved by adding a new dimension to the current planning methods- one that enables everyone on the project to SEE and to easily understand exactly what will be going on ahead of time.  4D planning does exactly that, and therefore makes this breakthrough a reality.

Read More

Improving Construction The Synchro Way: Real Results

Posted by Sue Dengenis on Jan 13, 2016 12:03:40 PM

It's January, kick off the year with a commitment to continuous and measurable improvement!

In 2015 the use of 4D planning and scheduling increased significantly- numerous presentations were made at conferences demonstrating the implementation workflows and the powerful results: improved safety, increased productivity, lower cost and greater reliability.  The results come from the transparency and cooperation that true 4D visual scheduling enables. 

 Why the big interest in 4D BIM for construction?  The industry is at a point were complexity continues to grow and profit margins are slim- something has to change or the risks inherent in construction will outweigh the benefit.  Traditional CPM and Gantt charts tools have been the standard for decades but the results have left the industry in a place where on-budget and on-time are not the norm and only sometimes achieved-last year in the UK only 40% of projects were delivered on time.   Thankfully, however, the future is bright. Industry leaders who have chosen to challenge the status quo are reaping the rewards from purpose built 21st century digital technology.  Synchro PRO is leading Improvement, Innovation and Cooperation- the results are significant.

Read More

How 4D scheduling creates synergies between BIM & Lean

Posted by Roar Fosse on Dec 2, 2015 11:03:14 AM

With new tools come new methods. There are numerous examples of this when it comes to Lean Construction and BIM, where new BIM tools require new processes that very often encompass several lean principles. I tend to say that Lean is the right leg and BIM is the left leg, and although you could stand on either one, in a fiercely competitive market that constantly shifts, it is easier for a construction company to maintain balance by standing on both. 

4D scheduling is one example of synergy where BIM can be used to achieve lean effects, either to support traditional planning methodology or to complement the Last Planner™ System. This blog post is meant to give an introduction to 4D scheduling and how some projects at Skanska achieves lean effects from using 4D in projects.

Read More

MAXIMIZE THE VALUE OF 3D DATA THROUGH 4D PLANNING

Posted by Jacqueline Chen on Oct 29, 2015 10:00:00 AM

Several months ago, I was involved in a complicated heavy highway project which included the reconstruction of multiple State roads, the preservation of several bridges, the replacement of partial MSE retaining walls underneath ramps, the replacement of two sign structures and upgrades to existing traffic signal systems, not to mention traffic switches, closures and detours of ramps, intersections, overpasses and pedestrian walkways. I recalled that my morning started with a review of drawings (296 pages, half-size) with a construction manager who had over 25 years of experience. We were requested to provide a draft of the design schedule along with a PS&E submission by end of the following week. Seven revisions were done after, and a “what if” analysis was performed to estimate open to traffic time of one major ramp and predict project finish dates with different notice-to-proceed dates.

Read More